Gain Immediate access to our Essays
FREE access exchanged for your work, or pay £9.99
Words: | Submitted: Tue Jun 20 2006
... of Tables Table1: Summary of geotechnical properties of the subsurface at the project site ... Table2: Tabulated settlement calculation. ... ... ... ... ... ... Table 3: Summary of the depth of embedment of the pile group at the project site ... ... ... ... ... ... ... ... ... 1.0 INTRODUCTION AND PROJECT BRIEF Remarks 1.1 Is proposed to build a retaining wall as part of a road scheme that runs across a sloping land that is to be developed as part of a retailed park. The land slopes from north to south at 15o. The new road will be 6.5 meters below the level of the car park for the retail units. The current level at the site of the proposed retaining wall is 40mAOD; the level of the road will be 35AOD. The retained height above the final road level will be 6.5 m but at some time during construction the maximum height could be 7.00. This allows the road pavement to be built. The road, at the base of ...
FREE access exchanged for your work, or pay £9.99